TM 55-2840-231-23
3-6. COMBUSTION SECTION - REMOVAL - Cont.
ENGINE/Continued
11. Combustion Case (6),
Air Tubes (18)
12. Combustion Liner (3)
13. Seal Rings (19)
14. Retaining Rings (17)
and Seal Ring (20)
15. Lockwire and
Positioning Plugs (22)
3-7. COMBUSTION SECTION INSTALLATION
INITIAL SETUP
Applicable Configuration
All
Special Tools
Turnover Stand, tool no. 6795579
Installation Clamp, tool no. 6799953
Installation Clamp, tool no. 6799952
3 - 1
6
Change 8
Separate the air tubes
from the outer combustion
case.
Remove from the engine.
Remove from the small
ends of the air tubes.
Remove from the large
ends of the air tubes.
Remove and lift off first
stage turbine nozzle shield
(21).
Consumable Materials
Antiseize Compound (item 6, Appendix D)
Lockwire (item 7, Appendix D)
Molykote (item 41, Appendix D)
Lubricating Oil (item 5, Appendix D)
Lockwire (item 7, Appendix D)