TM55-2840-251-23
SECTION VIII GENERAL MAINTENANCE PROCEDURES (Continued)
1-73
INSTALLATION/REMOVAL OF ENGINE OR
POWER SECTION IN/FROM STANDS
(Cont)
3.
Install power section in Stand (T. 51) (3) as
follows:
a.
Remove power section from engine (Task
4-1-1).
b.
Install two Adapters (T. 2) (11) on Stand (T.
51) (3) using three bolts (12), washers (13) and nuts (14)
on each. Torque nuts to 600 to 650 inch-pounds.
c.
Install mount Ring (T. 39) (6) on stand (3)
aligning holes at the 3 and 9 o'clock positions on mount
ring with the holes in the adapters (11). Secure ring with
four washers (13) and cap screws (15). Torque screws
to 250 to 275 inch-pounds.
d. Lower power section and install through mount
ring (6). Secure ring with 12 bolts (17) and nuts (18) .
Torque nuts to 36 to 40 inch-pounds.
e.
Remove hoist (1).
f.
Remove capscrews (19) and sling (2).
GO TO NEXT PAGE