TM55-2840-251-23
SECTION VIII GENERAL MAINTENANCE PROCEDURES (Continued)
1-73 INSTALLATION/REMOVAL
OF
ENGINE
OR
POWER SECTION IN/FROM STANDS
(Cont)
4.
Transfer power section from Stand (T. 51) (3) to
Stand (T. 50) (20) as follows:
a.
Rotate mount ring (6) to position power
section vertically.
b.
Install Lifting Eye (T. 9) (2) on propeller
shaft; secure with two capscrews (19). Torque
capscrews to 675 to 750 inch-pounds.
c.
Attach hoist (1) to lifting eye (2) and raise
hoist enough to support power section weight.
d.
GO TO NEXT PAGE
1-91