TM 55-4920-328-13
2-32. Installation of Engine Test Dolly.
Proceed as follows:
a.
Remove the engine dolly drawbar and attach the
test trailer crane assembly to the engine mount ring.
(Refer to paragraph 2-13 for crane assembly operating
instructions. )
b.
Raise and position the engine dolly assembly so
that the dolly axles are centered over the test trailer axle
latches.
c.
Lower the dolly assembly and guide the dolly
axles into the latch arm guides.
d.
Place latch arms (20, figure 1-3) over the dolly
axles and tighten the swing eye bolt handles (21).
e.
Detach and secure the test trailer crane.
f.
Attach ground cable assembly (2, figure 7-2)
from test dolly ground stud (31, figure 7-22) to a suitable
flange on the engine.
g.
Attach ground cable assembly (1, figure 7-2)
from test dolly ground stud to test trailer ground stud
(110, figure 7-3).
2-33. Engine and Power Absorption System Hose
and Cable Assembly Connection.
Connect the hose and cable assemblies between the
engine
and
power
absorption
system
and
data
acquisition assembly in accordance with table 2-9. See
figures 2-31 and 2-32.
Change 4
2-114.1/(2-114.2 blank)