TM 10-4930-351-14
0096 00
INSTALLATION
1.
Set pump on base.
2.
Place vane pump inner side plate (10) over shaft with outside face towards the impeller. (The inside face has grooves
connecting the inlet/outlet ports.)
3.
Rotate impeller-shaft assembly (11) to place vane pump rotor key way (12) at top of shaft.
4.
Place rotor key (9) in key way (12).
5.
Hold impeller shaft (11) and slide vane pump rotor (8) over shaft and key (9).
6.
Lay fuel transfer pump on inlet side and align inner side plate (10) mounting holes and fuel inlet/outlet ports (13).
7.
Place cam ring (14) over rotor (8) so that mounting holes are aligned, and the sixteen flow holes are aligned with the
corresponding inlet/outlet ports in the inner side plate (10).
8.
Carefully place a carbon vane (7) in each of the five slots in the rotor (8). New vanes will be square on both ends and
may be installed without regard for direction. Vanes that have been run in will have worn shorter in the direction of
rotation. Install used vanes so that short side leads in the clockwise direction of rotation.
9.
Place the outer side plate (6) over the rotor (8) so that mounting holes are aligned, and the fuel inlet/outlet ports are
aligned with sixteen flow holes in the cam ring (14). (The inside face has grooves connecting the inlet/outlet ports.)
10. Place the clamp plate (5) over the outer side plate (6) so that mounting holes are aligned. Apply anti-seize compound to
and install the four socket head screws (1), lock washers (2) and flat washers (3). Tighten the screws finger tight, then
tighten in a crossing pattern.
11. Install rotary vane pump housing. Refer to WP 0095 00.
12. Install rotary shaft seal housing and components. Refer to WP 0094 00.
END OF WORK PACKAGE
0096 00-2