TM 55-2840-254-23
Section II. COMPRESSOR BLEED BAND MAINTENANCE PROCEDURES
2-9 REMOVE COMPRESSOR BLEED BAND
2-9
INITIAL SETUP
Personnel Required:
68B10 Aircraft Powerplant Repairer (2)
Applicable Configurations:
All
Equipment Condition:
Oil Cooler Assembly Removed (Task 8-5)
Tools:
Interstage Air-Bleed Actuator Removed
None
(Task 2-1 )
Materials:
None
GO TO NEXT PAGE
2-41