TM55-2840-251-23
4-1 POWER SECTION (AVIM) (Continued)
4-1-1 REMOVAL
1. Install Sling (T.41) (1)
with four bolts (2), on
propeller shaft flange (3).
2. Cut lockwire, disconnect
coupling nuts (4) of power
turbine governor sensing tube (5)
at power turbine governor (6) and
center fireseal bulkhead coupling
(7). Cap open connections.
3. Remove nut (8) from bolt (9)
to release loop clamps (10) that
secure governor sensing tube (5)
and push-pull cable casing (11).
GO TO NEXT PAGE
4-4