NAVAIR 01-1A-505-3
TO 1-1A-14-3
TM 1-1500-323-24-3
014 02
1 September 2011
Page 48
7. Slide the intermediate insulator till it seats against the center contact.
8. Slide the intermediate contact till it is seated against the intermediate insulator.
2nd
2nd Shield
st
1
Shield
Ferrule
Shield
2nd Cable
Jacket
Intermediate
Intermediate
1st
Contact
Insulator
Insulator
Shield
Bushing
Ferrule
9. Fold the shield braid over the intermediate contact.
st
st
10. Slide the 1 shield ferrule over the shield braid till the shield braid and 1 shield ferrule are seated
against the intermediate contact. Shield braid must be between the contact shoulder and ferrule.
st
11. Crimp 1 shield ferrule using tools in Table 5 and NAVAIR 01-1A-505-1, WP 013 00.
12. Trim any excess shield braid even with intermediate contact and ferrule.
1st
2nd Shield
2nd
Intermediate
Shield Shield
Ferrule
Shield
Contact, Shield
Ferrule Braid
Intermediate
Braid and Ferrule
Insulator
Seated
2nd Cable
Jacket
Shield Braid must
1st Cable
Intermediate
Insulator
be trimmed even
Contact
Jacket
Bushing
with intermediate
1st Shield
contact and ferrule
Ferrule
Crimp Area
st
nd
13. Slide the insulator bushing up to the 1 shield ferrule. Fold 2 shield toward intermediate contact and
nd
nd
slide 2 shield ferrule toward intermediate contact till insulator bushing and 2 shield ferrule seated against
intermediate contact. Fold
2nd
Shield
Intermediate
Insulator
2nd Cable
Jacket
Intermediate
Contact
Insulator
1st Cable
2nd Shield
Bushing
Jacket
Ferrule
Figure 41. 617190014 and 617090014 Triaxial Contact Buildup (Sheet 2 of 3)