TM 55-2640-231-23
1-29. Engine - Removal From Shipping Container - Continued
LOCATION/lTEM
REMARKS
ACTION
I
1. Engine Shipping
Container
2. Engine Shipping
Container
3. Engine Shipping
Container
4. Engine Shipping
Container
5. Engine
6. Engine Side Mounts
7. Engine Side Mounts
Make certain that all air pressure has
been released before loosening nuts
and bolts (1 and 25). If nuts are re-
moved before pressure is released, in-
ternal pressure could blow off cover.
Injury to personnel could occur.
Insure upper half of shipping con-
tainer does not strike engine when
removing cover. Damage to engine
could occur.
Use Engine Assembly Lift, Tool No. 6796963.
Loosen nut (15) and
washer (16). Remove
engine records from
record receptacle (18).
Loosen nuts (21 ) and
washers (22). Open
cover (23).
Loosen air valve (24).
Allow container to
depressurize.
Remove nuts (1) and
bolts (25). Remove
cover (2).
Install engine assembly
lift on gearbox mounting
pad. Attach hoist. Raise
engine only enough to
take the strain off the
mounts.
Remove four nuts (7),
washers (6), and bolts (4).
Remove two cotter pins
(8), pins (9), and adapters
(5).
1 - 2
6
