Cable
12. Slide ferrule over dielectric insulator till
fully seated.
Center
Shield
Contact
Dielectric
Ferrule
Ensure Second
Braid
Insulator
Conductor Faces Crimp
Ferrule
Die Flat.
Crimp
Area
Second
Cable
Conductor
Intermediate
Contact
Crimp Die
Center
Dielectric
Contact
Insulator
Insulator
11. Slide the center insulator over center contact till seated.
12. Slide intermediate contact over center insulator.
13. Put the second conductor into the intermediate contact slot.
14. Slide the ferrule over second conductor and crimp using tools in Table 5 and NAVAIR 01-1A-505-1,
WP 013 00. Ensure second conductor faces crimp die flat.
Shield
Outer Contact
Crimp
Ferrule
Cable
Sleeve
Intermediate
intermediate
Contact
Dielectric
Contact
Insulator
Insulator
15. Slide the intermediate insulator over intermediate contact till seated.
16. Slide outer contact body over intermediate contact sub-assembly till fully seated.
Push in on Cable
while crimping.
Designated
Black Band
Cable
Crimp Area
0.098"
2.5 mm
17. Crimp outer contact body in the designated area using tools in Table 5 and NAVAIR 01-1A-505-1, WP
013 00. Continue to maintain inward pressure on cable while crimping to ensure all parts a properly
seated.