NAVAIR 01-1A-505-3
TO 1-1A-14-3
TM 1-1500-323-24-3
014 02
1 September 2011
Page 41
Environmental
Boot
1. Slide environmental boot on cable (if
Cable Jacket
required) prior to stripping.
2. Strip outer cable jacket to dimensions
shown, IAW NAVAIR 01-1A-505-1 WP 009
00.
3. Comb shield braid and slide ferrule over
0.709"
shield braid till seated on cable jacket.
18 mm
Cable Jacket
Combed
Ferrule
Shield
0.157"
0.177"
0.354"
Cable
4 mm
4.5 mm
4. Fold shield braid over the cable jacket and
9 mm
Jacket
trim to dimension indicated.
5. Trim center and intermediate conductors to
correct length.
6. Strip center and intermediate conductors to
dimensions shown, IAW NAVAIR 01-1A-505-
1 WP 009 00
0.236"
Shield
6 mm
Ferrule
0.421"
Braid
10.7 mm
7. Put the two wires in the insulator until it hits the shield braid.
8. Slide center wire into center contact. Ensure dielectric is butted on the shield braid and that
center is visible in contact inspection hole
9. Crimp center contact using tools in Table 5 and NAVAIR 01-1A-505-1, WP 013 00.
Cable
Jacket
Center
Contact
Crimp
Area
Figure 39. 617152 and 617052 Triaxial Contact Buildup (Sheet 1 of 3)