Dielectric
Insulator
10. Slide ferrule over dielectric insulator till
fully seated.
Shield
Ferrule
Braid
11. Slide the center insulator over center contact till seated.
12. Slide intermediate contact over center insulator.
13. Put the second conductor into the intermediate contact slot.
14. Slide the ferrule over second conductor and crimp using tools in Table 5 and NAVAIR 01-1A-505-1,
WP 013 00. Ensure second conductor faces crimp die flat.
Figure 36. 617190010 and 167090010 Triaxial Contact Buildup Buildup (Sheet 2 of 3)